Client: Bryn Mawr Trust Company
Systems installed:
4Post
MobileTrak3®
The solution was a MobileTrak3® System equipped with 4Post archive shelving. Due to the restricted height of the ceiling in the basement storage are, the MobileTrak3® was chosen to maximize the height of the storage system without compromising storage capacity.
The new system drastically improved their storage situation, freeing up valuable floor space and allowing the bank to move their storage to an area of the building that wouldnt otherwise be used to house their expanding personnel.